- Updated
drawdown effects
of 24x7 days pumping to nearby
wells -2.83mi data supplied by LBFH, Inc. & Dickerson Florida plotted
By Mr. Kevin Rohrer – a professional
geologist and certified hydrologist from S.F.W.M.D. who
is in charge of reviewing this permit.
- Letter
- 07/01/2004 new proposed mining plan page
one
- Letter
from Florida State Historical Resources Division page
1, page
2
- Scanned
- new proposed entrance/exit to the mine date 07/01/2004
200x, 600x, 1000x (dial
up connection might take sometime to
load)
1000x has better resolution, clearer when magnified.[ Use Netscape
7.+ or IE6.+
for better viewing. To AOL users, connect to AOL and launch netscape
or IE
then type norock.org on the address bar of the browser.]
- Visual
Modflow plotted -extent of the dewatering effects
to nearby areas
This is only phase one. No actual studies have been done to find
the real effects for the 964 acre mine
- New
proposed 12 phases of the mine - 200x, 600x, 1000x
or
download each section scanned and
paste together: part1, part2, part3
- who's
who with the proposed mining
- location
of the proposed mining
- new
road proposed for the mine simulated scenario based
on the plans & number of trucks, video taken from Indrio
Pit and Miami quarry
Note:
Don't be fooled by the new smaller phases as the effect
will still be the same as the previous proposal. Same
amount of dirt coming out in the end of each phase. Same
amount of dust, same number of vehicles, same machineries
to run the mining operation.As for the Paleo Hammock
and Florida State Historical Division's unconcerned attitude
toward the project read this opinion.
|